Jinko Power aggregates one or more resources by means of a "virtual power plant" with adjustable (interruptible) loads, energy storage, electric vehicles and distributed power sources to achieve autonomous coordination and optimal control within the project site's power grid, creating favorable conditions for the subsequent participation of the distribution grid as the main body in power system operation and power market trading. In the future, the virtual power plants can serve as “positive power plants” to supply power to the system for peak regulation, and as “negative power plants” to increase load consumption to match the system for valley filling.